|
by James TaylorHardcover details (USA). details (United Kingdom). details (Germany). details (Canada). ISBN: 978-1-932159-11-0 ISBN-10: 1-932159-11-8 J. Ross Publishing · 2007 |
| See also (possibly by other authors): | ||
| 2014 | Hardcover | Project Scheduling and Cost Control: Planning, Monitoring and Controlling the Baseline |